10,500+ Acre Holding with Land Available

Impressive Land Holding with Current Availability

Able have a wide range of Land and Building Developments available for rent and sale, we are committed to utilising Green Energy and incorporating Biodiversity Net Gain (BNG) techniques in our approach to development which leaves biodiversity in a measurably better state than before the development took place.

Humber Region

Able Energy Park (AEP)

Located on south bank of the Humber in close proximity to the Carbon Capture Pipeline, AEP is a development with approvals to provide 1,700,000m² of warehousing, external storage and transport depots to allow port centric logistics operations at one of the UK’s busiest port locations. Tenants will benefit from close proximity to the deep-water quays at AHP.

This on-going investment strategy has enabled the facilities to continue to develop and service our traditional markets as well as prepare for emerging business sectors like Offshore Wind.

Current opportunities include and not limited to:

  • Manufacturing of materials for batteries. 

  • Battery energy storage systems.

  • Energy from waste.

  • Carbon dioxide energy storage for electric generation. 

  • Cryogenic energy storage. 

  • Data bank storage facility. 

  • Graphitisation production. 

  • Green and blue hydrogen production. 

  • Offshore floating solar manufacturing. 

  • Offshore wind installation manufacturing facilities. 

  • Offshore wind installation yards. 

  • Recycling offshore wind turbines and redundant offshore oil and gas structures. 

  • Solar power generation in the vicinity of our Humber Port development with direct wire connections to Able Energy Park (AEP) and Able Humber Port (AHP) providing green energy in the most economical manner - this reduces requirements of the National Grid infrastructure. 

  • Sustainable aviation fuel projects. 

  • Synthetic fuel production. 

Able Humber Port (AHP)

The Able Humber Port (AHP) development will create UKs largest Super-Port on the Humber Estuary (South Bank) and has close proximity to the Able Energy Park (AEP).

AHP will be a bespoke facility to serve the needs of the burgeoning offshore renewable energy sector(s). The Development Consent Order received from the UK Government enables the construction of new deep-water quays and provides an extensive hinterland to support the manufacture and installation of offshore wind turbines.

The UK’s first public Electric heavy goods vehicle (EHGV) charging stations will open in Q1 2025. The new EHGV charging hub will drive the decarbonisation of future transport and logistics across AHP and the South Humber ports as new Electric powered HGV’s replace existing diesel fleets.

ABLE Thorpe Marsh (ATM)

This iconic site at Barnby Dun, Doncaster, South Yorkshire offers 17 hectares (42.4 acres) and lends itself to a variety of potential uses, particularly power generation, as the site has immediate access to the National Grid via an adjacent sub-station.

ATM obtained planning approval for a Gas fired 1.5GW power station.

North East Region

ABLE Seaton Port (ASP)

A multi-user port (51 hectares – 126 acres) near the mouth of the River Tees. ASP has seen considerable investment over the last decade including providing 635m of new heavy-duty deep-water quays.

It is the Group’s main operational centre, and its location is well suited to serving the needs of the offshore wind sectors, marine recycling as well as more conventional logistics requirements. The significant investment in a range of specialist lifting and product handling equipment provides a one-stop shop for the majority of contracts.

ABLE Middlesbrough Port (AMP)

This site is truly unique, offering large fabrication halls with numerous gantry cranes and floor rails already installed, alongside heavy load-out quays (6,000T Quay 10 and 4,000T Quay 8 & 9) and a heavy lift pad of 25T/m² (Quay 1). 

It is located on the River Tees in the centre of Middlesbrough with good sea access and deep-water quays @ 4m. 

The site encompasses 14.7 hectares (36.3 acres) offering 9,900m² of workshop and assembly space. It has six strong and dependable quays (including a 220m quay) that have been used for a variety of routine heavy-lift projects in the past particularly for the construction and exporting of offshore oil and gas platforms. Existing quays have a heavy-load out pad with potential to increase this further.

ABLE Clarence Port (ACP)

This 19 hectares (47 acres) site is in the heart of the industrial centre of Teesside and offers around 210m of river frontage.

On the North bank of the River Tees, it sits on the opposite side of the river to ABLE Middlesbrough Port. Adjacent to the existing ‘Clarence Lower Wharf’.

The company are awaiting a decision for a planning application to construct a new 140m deep water quay supported by 30 acres of heavy-duty storage land. This will then provide a project quay suitable of handling the importation of large plant, equipment and PAUs for development on the seal sands, as well as providing facilities to import raw materials for the existing waste to energy power station and potentially for other clients on the seal sands complex. This will provide the benefits of reducing the construction times and costs of new industrial complexes on the seal sands.

Billingham Reach Industrial Estate (BRIE)

BRIE is a thriving location with 330m of quays created on the site of the former North Tees Coal Power Station and is zoned for B2 and B8 uses. It offers flexible plots of industrial land on temporary and long-term leases.

The site has been the location for a number of industrial projects and with its useful deep-water quays provides an ideal location for activities that are reliant on river access and transportation. The sites ground conditions allow for heavy load bearing exercises to be undertaken and individual plots can be altered to meet customer’s requirements (including the construction of buildings).

Able have a variety of sites available for rent that are suitable for a range of uses. Please contact us below for further information:

Humber Region:

Marcus Walker - Development Director (Humber)

Telephone: +44 (0)1642 806080

North East Region:

Mark Ellis - Commercial Director

Telephone: +44 (0)1642 806080

Property/Building Development

ABLE Humber Port (AHP) is situated on the South Bank of the Humber Estuary, East Coast of the UK, which is one of the UK’s fastest growing port and logistics centres. It provides a range of properties and buildings that can be tailored to suit clients’ requirements.

AHP is Europe’s largest new port development providing an exciting proposal for the vehicle storage sector and a variety of port centric logistics functions. 

There are a number of ferries operating from the area together with Ro-Ro facilities at CLdN Ro-Ro Terminal, DFDS and Immingham Port. The DFDS terminal can accommodate stern/quarter ramp vessels 250m long x 34m wide, with a draft of 10m.

ABLE design, construct and provide facilities on a permanent and temporary basis to suit client’s specific requirements.

ABLE have a number of property developments for clients, site visits can be arranged at clients convenience. Please contact us for further information:

Marcus Walker - Development Director (Humber)

Telephone: +44 (0)1642 806080