Land/Property Development
Land Development
Able have a wide range of Land and Building Developments available for rent and sale, we are committed to utilising Green Energy and incorporating Biodiversity Net Gain (BNG) techniques in our approach to development which leaves biodiversity in a measurably better state than before the development took place.
Located on Humber Ports, AEP is a development that will provide 1,700,000m² of warehousing, external storage and transport depots to allow port centric logistics operations at one of the UK’s busiest port complexes. Tenants of AEP will benefit from close proximity to the deep-water quays at AHP.
This on-going investment strategy has enabled the facilities to continue to develop and service our traditional markets as well as prepare for emerging business sectors like Offshore Wind.
The Able Humber Port (AHP) development will create Europe’s largest Super-Port on the Humber Estuary (South Bank) and has close proximity to the Able Energy Park (AEP).
AHP will be a bespoke facility to serve the needs of the burgeoning offshore renewable energy sector(s). The Development Consent Order received from the UK Government enables the construction of new deep-water quays and provides an extensive hinterland to support the manufacture and installation of offshore wind turbines.
A multi-user port (51 hectares – 126 acres) near the mouth of the River Tees. ASP has seen considerable investment over the last decade including providing 635m of new heavy-duty quays.
It is the Group’s main operational centre, and its location is well suited to serving the needs of the oil, gas and offshore wind sectors as well as more conventional logistics requirements. The significant investment in the now provides a range of heavy-duty load bearing deep water quays and an extensive portfolio of specialist lifting and product handling equipment providing a one-stop shop for the majority of contracts.
This iconic site at Barnby Dun, Doncaster, South Yorkshire offers 17 hectares (42.4 acres) and lends itself to a variety of potential uses, particularly power generation, as the site has immediate access to the National Grid via an adjacent sub-station.
Thorpe Marsh Power Station was a 1 Gigawatt (GW) (1,000 MW) coal-fired power station. Initially operated by the Central Electricity Generating Board, the station was operated by National Power following privatisation in 1990. The station closed a few years later in 1994.
Able have a variety of sites available for rent or sale that are suitable for a range of uses. These include but are not limited to; sites for hydrogen manufacture, biofuels, battery storage and nuclear projects. Please contact us below for further information:
Marcus Walker - Development Director (Humber)
Telephone: +44 (0)1642 806080
Property/Building Development
ABLE Humber Port (AHP) is situated on the South Bank of the Humber Estuary, East Coast of the UK, which is one of the UK’s fastest growing port and logistics centres. It provides a range of properties and buildings that can be tailored to suit clients requirements.
AHP is Europe’s largest new port development providing an exciting proposal for the vehicle storage sector and a variety of port centric logistics functions.
There are a number of ferries operating from the area together with Ro-Ro facilities at CLdN Ro-Ro Terminal, DFDS and Immingham Port. The DFDS terminal can accommodate stern/quarter ramp vessels 250m long x 34m wide, with a draft of 10m.
ABLE design, construct and provide facilities on a permanent and temporary basis to suit client’s specific requirements.
ABLE have a number of property developments for clients to utilise, site visits can be arranged at clients convenience. Please contact us for further information:
Marcus Walker - Development Director (Humber)
Telephone: +44 (0)1642 806080